Construction of store room



After two days, construction work for the store started. It was my first experience in the field of civil works so was very much excited. I got in contact with a contractor through my brick supplier. At first he was reluctant to work with pre-casted concrete roof as he preferred TI girders roof with tile bricks but then agreed. Three labourers and one mason (raj) came with contractor to start the work. Room is 10 feet in depth,15 feet in width with 9 inch walls included.
                      I bought a ready made iron door and window from Green Town. Door is 3.5 feet in width.Construction of walls is straightforward but placement and positioning of door, windows and concrete girders was little tricky as we didnt want girder's full load to be on the window.


Carefully all concrete girders were placed and afterwards slabs were placed one by one. Special care should be taken while placing girders, if they hit the wall they can easily damage the wall specially one made from gara.
                 After all the slabs were placed, cement (mortar) was applied in the spaces between the slabs. Plastic sheet was placed above it and then Gara+Turi mixture was applied all over it. Roof's surface level was adjusted for drainage and plastic pipe was fitted to complete the work.

               COST ANALYSIS                                                                              Rs.
1) 4000 Bricks                                                                                                 29000
2) Izhar Concrete roof                                                                                      12000
3) Iron Door                                                                                                      4500
4) Iron Window                                                                                                 1200
5) Labour cost                                                                                                 10000
6) Cement 1 Bag+2 sq feet Bajri + 1 sq feet Sand                                                530
7) Iron Girder (Used above Door)                                                                        500
8) Trolley of Mud                                                                                               2000
                                                                                               TOTAL             59730